Finn is now All Gas No Brakes. Same team, same product, now the whole team.
Docs menu
All MCP tools
MCP tools · CRM
crm_update_follow_up
Mark a follow-up done or cancelled, snooze it, or change its due date, title, note, priority or assignee. The change is made as you, the user of your workspace, and shows in the record's history.
- Scope needed
- crm:write
- Acts as
- You, the signed-in member, with your role's permissions.
- Changes data
- Yes
- Held for approval
- No
- Available to
- Every organization
Inputs
| Name | Type | Description |
|---|---|---|
| org_id | string | Organization id. Optional when the user belongs to one organization. |
| follow_up_idrequired | string | The follow-up's id. |
| status | enum: open | done | cancelled | |
| due_at | string | New due time (ISO 8601 with timezone). |
| snoozed_until | string | Snooze until (ISO 8601 with timezone). |
| title | string | |
| note | string | |
| priority | enum: low | normal | urgent | |
| assignee_id | string | User id to reassign it to. |